Medium-term planning considering the roles of the Last Planner System in production strategy and management
Keywords:
Planejamento de Médio Prazo, Last Planner System, Estratégia de Produção, Gestão da ProduçãoAbstract
Although the Last Planner System (LPS) has often been studied as a method for production planning and control, specific characteristics of the construction sector require planning and control processes to assume broader, more systemic roles that normally fall under the concept of production strategy. Based on this understanding, this paper draws on an appropriate theoretical framework to examine the full range of LPS roles within both production strategy and production management. We argue for enhancing Medium-Term Planning (MTP) through practices that support the LPS at these two levels. Using Design Science Research procedures, the study identifies the main barriers that prevent the Medium-Term Planning process from fully supporting LPS roles. The literature review and empirical evidence allowed the development of a new MTP process model, designed not only to integrate planning levels but to align actions across company sectors. In doing so, the model helps establish the LPS as a genuine source of competitive advantage, which enables the production function to lead other functional areas.
Downloads
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Ambiente Construído

This work is licensed under a Creative Commons Attribution 4.0 International License.
Copyright
Authors of articles published in Ambiente Construído retain the copyright of their works, licensing them under the Creative Commons Attribution BY 4.0 license, which allows articles to be reused and distributed without restriction, provided that the original work is properly cited.


