Models for early cost estimating using linear regression
penitentiary projects modeling
Keywords:
Construction, Cost estimation, Linear regressionAbstract
Early cost estimation of construction projects is not an easy task, as such projects involve a high level of inaccuracy and uncertainty. Even in the early stages, errors in the estimates can result in financial loss and jeopardize construction completion. Therefore, the main objective of this research study is to present a framework for building cost estimation models, using the linear regression technique. The framework method is divided into five phases: (1) identifying the model’s requirements, (2) selection of the independent variables, (3) database construction, (4) data modelling and (5) model performance evaluation. A case study was conducted on federal penitentiary construction projects to test the applicability of the framework. Through the case study, two valid models were built, and their margins of error were 23 and 25%. The framework itself is one of the main contributions of this study, and it can be replicated by practitioners to develop models for construction cost estimation.
Downloads
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2022 Ambiente Construído

This work is licensed under a Creative Commons Attribution 4.0 International License.
Copyright
Authors of articles published in Ambiente Construído retain the copyright of their works, licensing them under the Creative Commons Attribution BY 4.0 license, which allows articles to be reused and distributed without restriction, provided that the original work is properly cited.