A design planning and control model for modular construction companies
Keywords:
Modular construction, Design management, Last Planner System, Collaboration, Planning and controlAbstract
Modular construction consists of the prefabrication of modules in controlled environments which are assembled in construction sites. The design process is crucial for the timely definition of modular components. This study aims to devise a collaborative planning and control model to improve the design process in modular construction companies, addressing project complexity and stage integration. The Design Science Research (DSR) approach was adopted, and two empirical studies were conducted in different projects. The model is grounded in the Last Planner System (LPS), being supported by collaborative practices and visual management tools. The results indicated that the model enhanced information exchange, transparency, and shared commitment. Furthermore, the implementation of collaborative meetings, supported by visual tools, improved integration among internal and external design team members, helping reduce inconsistencies and delays in the design process.
Downloads
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Ambiente Construído

This work is licensed under a Creative Commons Attribution 4.0 International License.
Copyright
Authors of articles published in Ambiente Construído retain the copyright of their works, licensing them under the Creative Commons Attribution BY 4.0 license, which allows articles to be reused and distributed without restriction, provided that the original work is properly cited.