A design planning and control model for modular construction companies

Autores/as

Palabras clave:

Modular construction, Design management, Last Planner System, Collaboration, Planning and control

Resumen

Modular construction consists of the prefabrication of modules in controlled environments which are assembled in construction sites. The design process is crucial for the timely definition of modular components. This study aims to devise a collaborative planning and control model to improve the design process in modular construction companies, addressing project complexity and stage integration. The Design Science Research (DSR) approach was adopted, and two empirical studies were conducted in different projects. The model is grounded in the Last Planner System (LPS), being supported by collaborative practices and visual management tools. The results indicated that the model enhanced information exchange, transparency, and shared commitment. Furthermore, the implementation of collaborative meetings, supported by visual tools, improved integration among internal and external design team members, helping reduce inconsistencies and delays in the design process.

Descargas

Los datos de descargas todavía no están disponibles.

Publicado

20.10.2025

Cómo citar

AMARO, Louise Chiarello; CAMBRAIA, Fabrício Borges; CUNHA, Vanessa Cardoso da; FORMOSO, Carlos Torres; BULHÕES, Iamara; NUNES, Jéssica; SOARES, Alexandre. A design planning and control model for modular construction companies. Ambiente Construído, [S. l.], v. 25, 2025. Disponível em: https://seer.ufrgs.br/index.php/ambienteconstruido/article/view/145551. Acesso em: 11 oct. 2026.

Número

Sección

Edição especial ENTAC 2024

Artículos más leídos del mismo autor/a

> >> 

Artículos similares

> >> 

También puede Iniciar una búsqueda de similitud avanzada para este artículo.