A design planning and control model for modular construction companies
Palabras clave:
Modular construction, Design management, Last Planner System, Collaboration, Planning and controlResumen
Modular construction consists of the prefabrication of modules in controlled environments which are assembled in construction sites. The design process is crucial for the timely definition of modular components. This study aims to devise a collaborative planning and control model to improve the design process in modular construction companies, addressing project complexity and stage integration. The Design Science Research (DSR) approach was adopted, and two empirical studies were conducted in different projects. The model is grounded in the Last Planner System (LPS), being supported by collaborative practices and visual management tools. The results indicated that the model enhanced information exchange, transparency, and shared commitment. Furthermore, the implementation of collaborative meetings, supported by visual tools, improved integration among internal and external design team members, helping reduce inconsistencies and delays in the design process.
Descargas
Descargas
Publicado
Cómo citar
Número
Sección
Licencia
Derechos de autor 2025 Ambiente Construído

Esta obra está bajo una licencia internacional Creative Commons Atribución 4.0.
Derechos de autor
Los autores de los artículos publicados por Ambiente Construido mantienen los derechos de autor de sus trabajos, licenciándolos bajo la licencia Creative Commons Attribution BY 4.0, la cual permite que los artículos sean reutilizados y distribuidos sin restricciones, siempre que la obra original sea debidamente citada.