Method for implementing standardized work as an additional element of location-based planning and control
Keywords:
Standardized Work, Location-Based Planning and Control, Takt Time, SlackAbstract
Standardized Work (SW) is an approach originated in the manufacturing industry, which aims to standardize and improve the efficiency of operations cycles, based on the Lean Production Philosophy. SW has the potential to support the implementation of Location-Based Planning and Control (LBPC) as it allows balancing the workload between workers or teams, contributing to the synchronization of processes. The aim of this study is to propose a method for implementing SW as an additional element of LBPC. Design Science Research was the methodological approach adopted in this investigation and an empirical study was carried out in a real estate company, in which the method for implementing SW was conceived and implemented. The following benefits were identified in the study: increase in the degree of process standardization, improvement in process synchronization, increase in the engagement of the work force with process standards, and improvement in terms of time reliability. The main contribution of this research study has been the adaptation of SW in the construction context as an additional element of LBPC.
Downloads
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2023 Ambiente Construído

This work is licensed under a Creative Commons Attribution 4.0 International License.
Copyright
Authors of articles published in Ambiente Construído retain the copyright of their works, licensing them under the Creative Commons Attribution BY 4.0 license, which allows articles to be reused and distributed without restriction, provided that the original work is properly cited.