Influence of electric arc furnace dust and lime kiln waste in Portland cement hydration
Palavras-chave:
Electric arc furnace dust, Lime kiln waste, Portland cement hydration, Portland cement mixtures.Resumo
Studies have indicated that the use of electric arc furnace dust (EAFD) results in a delay in the hydration time of Portland cement. Calcium-rich waste such as lime kiln waste (LKW) is one of the techniques used to offset this delay as it accounts for the lack of this element in calcium silicate hydrate (C-S-H) production in the mixture. The objective of this study was to evaluate the influence of electric arc furnace dust (EAFD) and lime kiln waste (LKW) in the hydration process of Portland cement pastes and their influence in setting time and hydration heat. The methodology used required several steps: physiochemical and micro-structural characterization of waste samples; definition and production cement pastes with different levels of waste substitution and a reference paste and evaluation of the cement pastes with respect to setting time and hydration heat. Results showed that the substitution of 1% EAFD with or without LKW presented similar hydration heats as the reference paste. This indicated that EAFD+LKW substitution would not affect substantially the hydration reactions of cement and could allow waste recycling in construction materials.
Downloads
Downloads
Publicado
Como Citar
Edição
Seção
Licença
Direitos Autorais
Autores de artigos publicados pela Ambiente Construído mantêm os direitos autorais de seus trabalhos, licenciando-os sob a licença Creative Commons Attribution BY 4.0, que permite que os artigos sejam reutilizados e distribuídos sem restrição, desde que o trabalho original seja corretamente citado.


